Tag Archives: plastic composite decking
one board of fire insulation decorative reasonable construction
Also applies to energy saving and decorative transformation of the old building; both applicable to all types of public buildings, class A fire insulation
decorative one plate is the composition of the adhesive layer, insulation decorative scrap board, anchor, sealing materials. Paul not only apply to new
construction of external walls
Temperature and decorative. Also applies to the outside of the residential building construction technology requirements. Class A fire insulation
decorative one board device method: First, the operating conditions of the class A fire insulation decorative one board, the flatness of exterior wall
construction to meet the acceptance requirements.
Qualified by the relevant inspection and acceptance. Jamb and wall connections should be set aside for energy-saving decorative plate thickness, the gap
should be layered to fill tight, good windows and doors to maintain. 3, the rain water pipe of the external wall surface of the card, embedded iron, the
device through the wall pipe, etc. to mention
Before installation is completed, and prior coordination of installation and energy saving decorative plates. 4, the construction of the basket and double
outside scaffold erection should be solid and reliable, compliance to specifications and procedures required. Scaffolding of horizontal and vertical rods
and the wall, corner and moderate distances, the scaffold board laying
Adapt and install the sub-grid. Precast concrete wall panels joint position ahead of deal in place. 6, hanging paste system operating ambient temperature
should not be less than 5 ° C, winter construction adhesives to be used antifreeze measures, dry hanging system for the above restrictions
. The wind is greater than 5 to stop the operation, the device when the wind speed should not be greater than 10m / S during the rainy season construction
should be prepared to rain measures. , Affixed to the construction sequence and construction of main points: the disposal of a wet paste system
construction procedure of a primary wall paint layer should be smooth
, Firmly, without hollowing, cracking phenomenon. Wall formation, intermediate plaster acceptance standards. 2, cell actinomycetes, punching, backplane
smear paste mortar devices TDD energy-saving decorative plate devices TDD butterfly anchor pendant 6 sealants or
Pointing putty Goufeng 7, clean appearance of three, hanging Post System Works: 1, the primary wall disposal: For the dirt on the walls, soft and
hollowing of the plaster layer and grease, etc., shall be the total eradication of clean, plaster layer must be broken patch leveling
. Long moss of old walls, thoroughly cleaned using pesticides. New buildings and exterior plastering shall comply with the specifications. 2, Brushing
Interface mortar: mortar interface with roller brush or broom evenly brushing or mechanical spray. Shall not drain brush should not be too thick, brushed
. 3, polymer bonded sand preparation: adhesive mortar: water = 4.5:1 weight ratio) proportion of water is added (this is the reference scale) using an
electric mixer to stir evenly, put it aside for 5-10 minutes, stir again , mixing a good mortar
Preferably within 2 hours, is strictly prohibited solidification of the mortar is the second stirring and then put into use. 4, according to the drawings
in line with the size, wall actinomycetes: the side wall, roof, at the thickness of the insulation decorative plate hanging vertical, set square, playing
the thickness of the line of control, and
The shells wall insulation decorative board mounting the Line of Control. TDD devices TDD butterfly anchor: first butterfly anchor piece line position
anchor according to the design and construction put into the primary wall, TDD energy-saving decorative plates in place immediately after the device TDD
butterfly anchor pendant. Equipment
Pendant with decorative plate connection is secure. Device shall not be moved, the loose bonding good decorative plate. So as not to affect the strength
of the adhesive mortar. 6, sealants, or pointing putty pointing: caulking to use insulation materials caulk, and then building Weatherproofing Sealant
Pointing, or pointing putty construction Weatherproofing Sealant or pointing putty thinnest not less than 3mm thick, plastic joints should hook into a
full, dense, continuous, uniform, and no bubbles in the concave groove. 7, to protect the membrane, clean appearance: sealant or pointing tired
Sub-dry and ripped off the protective film on the plate surface cleaning, and beware of the scratch board. 8 acceptance: to protect the film, clean
appearance, check the flat plate surface, vertical and angle of yin and Founder. Do not meet the requirements change in time.
